5月8日,2021年

Erin Ventures在塞尔维亚的Piskanja Boron项目获得了许可延期

In accordance with the Serbian Law on Mining and Geological Exploration, Erin Ventures received a license extension for its Piskanja Boron Project, The license renewal grants Erin until September 25, 2023 to complete the necessary studies and gain approval for the ‘Certification of Reserves’ and the ‘Approval of the Exploitation Field’, as the first two (of three) steps in the mineral exploitation and mine licensing approval process, as per Erin’s request.

Piskanja Boron Project in Serbia is Erin Venture’s wholly owned boron deposit with an indicated mineral resource of 7.8 million tonnes (averaging 31.0 per cent B2O3), and an inferred resource of 3.4 million tonnes (averaging 28.6 per cent B2O3), calculated in accordance with the Canadian Institute of Mining Definition Standards on Mineral Resources and Reserves (CIM Standards), as disclosed in Erin’s report titled, ‘Mineral Resource Estimate Update On The Piskanja Borate Project, Serbia, October 2016 – Amended February 28 2019’ – prepared by SRK Consulting (UK) Ltd.

“储备证明”主要包括提交和批准塞尔维亚合规矿产资源计算和技术经济评估,这些经济评估近似于CIM兼容初步经济评估(PEA)的范围和信心程度。“开发领域的批准”主要包括提交和批准塞尔维亚符合塞尔维亚符合可行性研究和环境影响评估,并近似于CIM兼容的预可行性研究。

来源:Bignewsn乐动游戏下载etwork.com.